Business Projects
PROJECT TITLE: AUXILIARY COOLING CONTINUOUS FILTRATION SYSTEM
Scope Summary:
This scope included the design, supply, installation and commissioning. This was a turnkey solution where ORDAINED TRADING was responsible for the complete project.
PROJECT TITLE: RECLAIMER BOGIE ALIGNMENT
Scope Summary:
The development of Reliability Bases Optimization on critical equipment on ELGEN PLANT
PROJECT TITLE: RELIABILITY BASES OPTIMIZATION SYSTEM ELGEN PLANT
Scope Summary:
The development of Reliability Bases Optimization on critical equipment on ELGEN PLANT
PROJECT TITLE: OFF GAS SCRUBBER PLANT FAN VIBRATION INVESTIGATION
Scope Summary:
The scope of work is to investigate the cause of vibrations on the OFF – GAS SCRUBBER PLANT Fans and recommend solutions to eliminate the problem. Both C& D lines will be covered as part of the scope. The battery limits for the scope are:
PROJECT TITLE: GOODS AND SERVICES CONTRACT
Scope Summary:
This Contract is for Reliability Based Optimisation, Design, Analysis, Construction, Project Management, Professional Review, and General Steel and Civil Construction for Metalloys.
PROJECT TITLE: BOILER DRUM INTERNALS REMOVAL
During the 2015 ELGEN Shutdown period, a statutory pressure test will be performed on the steam drum. The drum internals must be removed for the pressure test, and reinstalled afterwards.
PROJECT TITLE: INSTALLATION OF ID FAN DAMPER BUSHES AND SHAFTS
During the 2015 ELGEN Shutdown period, the ID fan damper bushes and shafts will be replaced. All replacement components will be supplied by BHP Billiton Metalloys.
The detailed scope of work is as follows:
PROJECT TITLE: NON DESTRUCTIVE TESTING OF RAIL BOLTS
Scope Summary:
The scope of work is to perform non destructive testing on rail bolts as per procedure 14-BHP-MTL-PROP-0001 Non Destructive Testing Proposal for Rail Bolts. Recommendation on the load conditions will be included as part of the inspection reports. Tests were done every 50m of the 300m rail.
PROJECT TITLE: DESIGN OF WATER SUPPLY SYSTEM FOR EXTINGUISHING FIRE (AIR HEATER UNIT 1-6)
Scope Summary:
The scope of work is to design a water supply system to extinguish fire inside the air heaters. The designed system should cater for Units 1- 6. The water supply line must tap off from the existing fire hydrant. The water supply system must accommodate fire detections components. However, the valve on the water supply line to each air heater must be manually actuated in the event of fire inside the air heaters. Technical support must be provided throughout the manufacturing and installation phase of each unit. Unit specific drawings must be provided, supported by the engineering reports detailing variation justification, if any, from one unit to the other.
PROJECT TITLE: AIR HEATER SOOTBLOWING MODIFICATION AND OPTIMIZATION DESIGN FOR UNIT 1-6
Scope Summary:
The scope of work is to study, recommend and design modifications to optimize sootblowing on the air hear for unit 1-6. All site measurements and data collection necessary for the study must be included as part of this scope. Technical support must be provided throughout the modification justification, manufacturing and installation phase of each unit. Unit specific drawings must be provided, supported by the engineering reports detailing variation justification, if any, from one unit to the other.
PROJECT TITLE: ESKOM MEDUPI RELIABILITY BASES OPTIMIZATION
Scope Summary:
The development of Reliability Bases Optimization on critical equipment for Eskom Medupi Power Station.
PROJECT TITLE: BOILER DRAIN LINES ENGINEERING FAC SCOPE
Scope Summary:
The scope of work is relevant to the following Unit 2 & 5 Boiler and Turbine drain lines:
PROJECT TITLE: DESIGN, CONSTRUCT, COMMISSIONING AND OPERATION OF EMALAHLENI FABRICATION WORKSHOP
Scope Summary:
The scope of work is to design, construct, commission and operate a Fabrication Workshop at Emalahleni. The workshop area must be over 1600m2 with a 20 ton and a 10 ton crane. The facility must be energy efficient and reliable.
PROJECT TITLE: VDB /CPH/2014-3000009911- ABATEMENT OF VOC EMISSIONS
Scope Summary:
The scope of work is to design, construct, commission Abatement of VOC Emissions. It is ArcelorMittal South Africa Vanderbijlpark Works, Coke & Chemicals’ intention to install a Volatile Organic Compound emission abatement plant on the tar plant of Coke & Chemicals which will abate emissions from 18 identified point sources combining in a ducting system to a Regenerative thermal oxidation plant (RTO) on plant which will abate the emissions to an acceptable environmental compliance of below 130mg/Nm3.